Office-Space-Facilities

Lobby

The lobbies are designed with dramatic 60 ft high ceilings and with all natural materials such as elegant wood paneling and polished granite

Façade

An interconnected glass and metal façade, spans approximately a quarter mile length across the four buildings, creating the effect of one horizontal tower

Floor Type

Raised flooring installed

Floor Sizes

Levels 1-2: Typical Business Center floor, approx 7,500 ft2 Levels 3–14: Typical office floor, approx 15,000 ft2

Elevators per building

5 x high speed passenger lifts 1 x service lift Escalators for basement parking within each building

Air Conditioning

The office portion of the tower is serviced by a central Variable Air Volume (VAV) system on the roof. The system consists of floor mounted air handling units, housed in a double-walled architectural plant room

Electrical

The electrical service for the facility, provided by Dubai Electric and Water Authority (DEWA), is three-phase, 230/400 volt, 50 Hz

Security

24/7 security CCTV throughout the building Keri System Card Access system (USA)

Business centre

Conference/training room facilities, meeting rooms, and offices

Parking

Ample parking (1553 spaces with and additional 280 spaces for visitors, thus one space for every 544 ft2)

The Galleries Plaza

The Galleries Plaza, will be landscaped with shaded meeting spaces and water features and will offer a choice of coffee shops, convenience retail outlets, areas for relaxation, and a central amphitheatre for cultural, arts and social events.

Tenancy Condition

The building is finished to shell and core standard consisting of structural frame, raised floors, external enclosure, vertical ducts, shafts and internal walls enclosing public areas.

Environmental Sustainability

  • The Galleries Buildings 1-4 feature water-efficient toilet cisterns and tap heads

  • that cut water consumption by up to 30 percent.

  • Energy consumption is reduced as energy- efficient light fittings and

  • movement sensors are installed in all lobby areas.

  • Air conditioning costs are reduced due to high performance glass facades,

  • which allow the optimal amount of natural light in, but keep heat out.

  • The buildings are a no smoking zone, leading to improved employee

  • comfort and productivity.

  • Condensate (distilled water) from the AC system is collected and reused within

  • Downtown Jebel Ali, further reducing demand for potable water.